Hospitality · France
A project of 150 individually styled frames. This was a fast-paced production process from the point of quotation to manufacturing and delivery. Each phase lasted less than a week, requiring precision and careful pre-planning. Despite the tight deadlines, everything was delivered on time and installed ready for the launch of the hotel.
CASE STUDY
A project of 150 individually styled frames. This was a fast-paced production process from the point of quotation to manufacturing and delivery. Each phase lasted less than a week, requiring precision and careful pre-planning. Despite the tight deadlines, everything was delivered on time and installed ready for the launch of the hotel.